This is part 2 of the first floor bathroom remodel.

See previous entry: Part 1

In part 1, I left off where the shower had been retiled and new faucet and shower head installed. Since then the walls have been patched, electrical repaired and repurposed and lower walls clad in bead board and cap and baseboard trim.

General overview of the room with woodwork in place, but before any cleaning and painting. Even so, it looks pretty darned good since its last inception.

First sections of bead board go up. No, its not real beaded board that is hung similar to T&G floors, but it'll do. The outlet is where a terrible old huge heater was circa 1940's. Reused the electric for the outlets, which the room lacked.


Same as above but with baseboard and cap in place. note notched cap for the wall switch - easier to notch the wood than to move electrical.

The Sink Wall ready for caulk and paint. The floor still needs to be scrubbed and the scuffs on the wall removed before painting.
More electrical excitement: This is the recess behind where the old medicine cabinet was.
The previous cabinet was a chromed 1940's behemoth that looked more like a Chrysler than a medicine cabinet.
It had 2 lights integral to the structure that were fed by a single electrical line to the top of the cabinet.
That line was split into 2 for some 1880's Bradley and Hubbard sconces that I will add to either side of a custom built medicine cabinet with an antique walnut framed mirror.